Use and wear safety glasses or goggles at all times during job.
Chemical resistant gloves are provided and should be used.
1. HOLE PREPARATION
Dig Hole:
Depth: Approximately 3 feet.
Width: Approximately 4″- 6″ wider than the diameter or width of post. Example: A 4″ post = 8″-10″ hole diameter.
Remove any standing water from hole.
2. LEVEL AND SECURE POST
Place post in center of hole; level and secure in position. Post can be secured with temporary supports or held in place by another person.
3. MIX, SHAKE & POUR
Mix – Remove caps and pour contents of “A” container into “B” container.
Shake – Replace cap on “B” container and shake vigorously for 20 – 30 seconds.
Pour – Quickly remove cap and pour contents into hole. Chemicals begin to expand 20 – 30 seconds from time of mixing. Once expanded and dry, excess foam can be cut away with a shovel or knife.