Instructions

Use and wear safety glasses or goggles at all times during job.

Chemical resistant gloves are provided and should be used.

1. HOLE PREPARATION

  • Dig Hole:
    • Depth: Approximately 3 feet.
    • Width: Approximately 4"- 6" wider than the diameter or width of post.
      Example: A 4" post = 8"-10" hole diameter.
    • Remove any standing water from hole.

2. LEVEL AND SECURE POST

  • Place post in center of hole; level and secure in position. Post can be secured with temporary supports or held in place by another person.

3. MIX, SHAKE & POUR

  • Mix – Remove caps and pour contents of “A” container into “B” container.

  • Shake – Replace cap on “B” container and shake vigorously for 20 - 30 seconds.

  • Pour – Quickly remove cap and pour contents into hole.
    Chemicals begin to expand 20 - 30 seconds from time of mixing. Once expanded and dry, excess foam can be cut away with a shovel or knife.


Postloc works with all materials.

 

View Instructions PDF